Description
Utilizing Federal Funds the Marengo Road Bridge crossing Rush Creek will be reconstructed, and the road will be reconstructed from Airport Road to Rt. 23.
Phase one engineering for the bridge will be conducted late 2022 and the road portion of the project will be done in 2023. Further engineering is scheduled to take place in 2025 with anticipated construction to take place in 2026. The Bridge is funded through the federal bridge program and is funded at 80% with a 20% match, and the road way is funded at 90% with a 10% match.